99精品在线,伊人久九大香蕉精品视频网,精品国产综合一区,黄色福利在线免费观看

您的位置:主頁 > 職業(yè)資格 >
мостовой парк ПМП (англ.версия)
2023-03-13 22:55 自考


快速報名入口


姓名

手機  

Soviet Army.
Engineering corps (Years sixtieth - seventieth) Pontoon-bridging column PMP  (ПМП)

Pontoon-bridging column PMP is designed to provide bridges and ferries. The complete set of PMP equipment is used to construct 60 ton and 20 ton carrying capacity bridges and 20 ton up to 170 ton carrying capacity ferries. The most frequently used ferries are 40-, 60-, 80- ton floating sections and 130-, 170-ton floating and abutment sections.

PMP construction basic characteristics:
1.Ferries and bridges are constructed as entire floating sections;
2.PBC consists of folding four-pontoon sections ready to be used as parts of the bridge or the ferry;
3.The complete set of PMP equipment may be used either as a bridge or as a ferry;
4.Landing pies are not needed for ferry transportation, the ferry may be fixed on the river bottom while loading and unloading;
5.The folding sections decks serve as a road;
6.Light vehicles may move in both directions.

PMP floating bridges basic characteristics:

Bridge carrying capaciry Road width (m.) Maximum length of the bridge (m.) Time needed for installation (min.)

60
20 6.59
3.29 227
382 30
50

PMP ferries basic characteristics:

Ferry carrying capacity (t.) Amount of ferries made of PBC units Number of sections needed per a ferry, units Length of the ferry (m.) Time needed for installation (min.)

floating abutment

40
60
80
130
170 16
10
8
4
4 2
3
4
6
8 -
-
-
1
1 13.5
20.25
27.0
46.0
59.5 8
10
12
13-15
16-20

Pontoon-bridging column PMP is full equipment for bridging through water obstacles . Since1962 the Soviet Army was armed with this type of PMP .

This equipment may be used for as a ferry to carry people and equipment through water obstacles. Besides PMP may include vehicles to transport equipment. The standard set of equipment allows to construct bridges of different length and carrying capacity.
The bridge length may be up to 227 m for 60 ton cargo; or up to 382 m for 20 ton cargo. Permissible current flow is up to 2.5 m/sec. The pontoons upper part is used as a road.
The PMP includes 32 floating sections, 4 abutment sections, 2 road covers, 12 tugboats. The transportation of the sections is performed by 38 KrAZ-255B trucks equipped with special devices.  The boats BMK-90, BMK-130 or BMK-150 are tugged by ZIl-130(ZIL-157) trucks with the help of a trailer or their own wheels . If PBC contains BMK-T boats; they are transported on 12 KrAZ-255B trucks platforms.

The KraZ truck carries one section, which includes two middle and two edge pontoons. The pontoons are connected by hinges. For transportation the section is folded up on the truck platform. The picture displays the truck with a floating section. Next picture is the back view of the truck with the section containing two middle right-angled pontoons and two edge curved pontoons. The abutment section is different from the floating section. Due to its form the abutment section allows to connect the bridge with the bank, besides, the section has folding devices so that cars could go down the bridge to the bank.

The section crew should consist of a driver and two pontooneers. It can also consist of a driver-pontooneer and a pontooneer. The procedure of installing the bridge or a ferry is as follows: the truck moves backward into the water up to the point where the depth is not less than 1 m; then the truck brakes abruptly; the pontooneer releases the hold; the section released rolls down the platform into the water easily.

In the water the section spreads under the influence of floatation powers with the help of hinges. In the picture the section is in the process of spreading (back view). At the moment the section is being hold by a mooring rope from the bank. The other edge of the rope is fixed on the truck. The driver-pontooneer and the pontooneer go up to the deck, lock the bottom and the deck to make the section construction rigid.

In the picture the section is spread (back view). After the deck and bottom are locked the pontooneers bring the sections closer to each other using hooks and lock the sections together. Thus the bridge line is being assembled along the bank. During the procedure the section is hold by mooring ropes fixed on the truck on the bank. As soon as the section is assembled the truck throws the mooring rope and leaves the site. The road width is 6.5 m.







注:以最新的政策為準,本文僅供參考,如有疑問,請及時聯(lián)系在線客服!
圖片由網(wǎng)友上傳,來源網(wǎng)絡(luò),如有侵權(quán),敬請告知刪除!

推薦專業(yè)
招生簡章
學歷相關(guān)
cisco
walmart
gamescast
spinwokrx
ngreen
vimeo
友情鏈接:
贏在路上學!“鏅(quán)所有 京ICP備16041791號-1 聯(lián)系我們點擊報名
贏在路上學校 版權(quán)所有
京ICP備16041791號-1 京公安備110108007008點擊報名 聯(lián)系我們點擊報名

首頁

咨詢

電話

日韩欧美在线观看一本| 欧美人人妻一区二区| 超碰caoporn亚洲精品91| 黑丝操我网站| 大几把插小穴视频网站| 人妻中文AV在线| 不要久久狠狠| 欧美性爱一二区| 天堂在线小说视频| 日韩视频 四区五区六区| 韩国伦理福利在线| 亚洲夜夜操夜夜操| 台湾熟妇少妇色综合视频区| 泸西县| 欧米茄亚洲成人av在线| 中文字幕,日韩精品,欧美,亚洲| 黑大鸡巴操B视频| 欧美激情五月婷婷App| 爱爱精品久久| 91欧美精品二区| 偷拍自拍在线观看免费在线观看免费| 欧美激情一区二区三区在线| 精品久久久免费不卡| 欧美自怕偷拍| 日韩欧美中文网站| 免费国产欧美久久久| 91色国产熟女| 黄色电影成人网| 老师张开腿让桶| 色欲无码一| 成人免费视频手机| 欧美日韩精品午夜| 久久人体视频| 久久久久久久久免费午夜电影| 91丨人妻丨大屁股| 欧美极品一二三区| 啪啪啪福利视频| 久久精品美女网站| 激情偷拍无码| 中文字幕人妻字幕一区二区| 一区二区日本免费看|